a) As of end October 2010, Malaysia has:
• 40 MW grid-connected power from Biomass;
• 1.7 MW from Biogas;
• 8 MW from Mini-hydro;
• 7 MW from Solid waste; and
• 1.5 MW from Solar PV

b) The following RE resources will be eligible for FiT:
• Biomass (including solid waste);
• Biogas (including landfill gas & sewage);
• Small-hydro; and
• Solar PV.

c) Solar PV 4kw to 30Mw / RM1.23 to RM0.85 : add RM0.26 for BIPV - in building structure. 21 years

Update on the Feed-in Tariff (FiT):
On 15th December 2010, the Renewable Energy Bill  (RE Bill) was presented into Parliament for its first reading. The Bill for Sustainable Energy Development Authority (SEDA Bill) Malaysia was also successfully presented in the same session.
The second and third readings of both the RE and SEDA Bills are scheduled to take place in April 2011. After the Bills have been passed in Parliament, they will be gazetted for enactment. SEDA Malaysia will then be legally established. The Feed-in tariff is envisaged to be implemented by mid-2011.
Resources for FiT:
The Final Report on National Renewable Energy Policy and Action Plan (Hadri et al, submitted to KeTTHA on 18th April 2009)
 Feed-in Tariff for Renewable Energies by Mr. Hans-Josef Fell, German Parliamentarian, Green Party (2MB)